==Overview==
 
==Overview==
Project/Task Manager can help you manage and track projects by allowing you to assign tasks to staff members, monitor the project’s progress and keep an eye on deadlines.
 
  
Project/Task Manager is easily accessible from your Backoffice Dashboard by clicking the '''Project/Task Manager''' link on the left navigation bar. (See figure 1). Currently, this tool is in the beta stage and is available on the Pro version of ChamberMaster and MemberZone.
+
Project/Task Manager can help you manage and track projects by allowing you to assign tasks to staff members, monitor the project’s progress and keep an eye on deadlines. '''NOTE:''' Currently, this tool is in the beta stage and is available on the Pro version of ChamberMaster and MemberZone.
  
 
+
[[File:PT Links CP.JPG|center]]
[[File:2015-06-05_9-32-18b.png|500px|frameless|border]]
 
 
 
'''Figure 1''' Accessing the Project/Task Manager module
 
 
 
==The Basics==
 
While Project/Task Manager has many features to give you granular control over project management, the core of this application can be broken down into a few steps:
 
 
 
#Creating projects
 
#Creating the tasks necessary to complete those projects
 
#Checking off tasks and projects as they are completed.
 
  
 
Using Project/Task Manager will give you the ability to:
 
Using Project/Task Manager will give you the ability to:
Line 24: Line 13:
 
*Create templates for recurring projects like bringing on a new member
 
*Create templates for recurring projects like bringing on a new member
  
==Create a Project in 10 Steps==
+
==Create a New Project==
To get familiar with the Project/Task Manager, let’s create a very simple project with one task.
+
 
 +
#Click '''Projects/Task''' in the left-hand navigation panel.
 +
#Click the '''Projects''' tab.
 +
#:[[File:New Project CP.JPG|center]]
 +
#Click the '''New Project''' button.
 +
#:[[File:Add Project CP.JPG|center]]
 +
#Enter the following:
 +
#*'''Category''': (Optional) Select a category project.  Assigning categories make it easy to filter and report on project.
 +
#*'''Template''': (Optional) If you have previously designed a template that can be used for this project, select it from the drop-down list.
 +
#*'''Name''': Provide a name for the project.  For Example: If you are creating a project for an event, you may wish to name it the same as the event. This field is required.
 +
#*'''Start Date''': Enter the project start date.
 +
#*'''End Date''': Enter the project end date. This field is required.
 +
#:'''Project Owner''': Select a project owner from the drop-down list. All of your active staff members will be available for selection.
 +
#Click '''Done'''.
 +
 
 +
The '''Projects''' tab will display the new project in the list of projects.
 +
 
 +
===Add Tasks to a Project===
 +
 
 +
Once a project has been created, you can add the tasks necessary to complete the project. A task can be big or small, easy or hard — but it's never more than a job that needs to get done to successfully complete your project.
 +
 
 +
#On the '''Projects''' tab, click the hyper-link for the project to which you wish to add tasks.
 +
#:[[File:Add Tasks CP.JPG|center]]
 +
#On the '''Tasks''' screen, click the '''New Task''' button. '''Note:''' You may create tasks on the '''Tasks''' tab as well.  See Create Tasks for further information.
 +
#:[[File:Task Add Edit CP.JPG|center]]
 +
#Enter the following information:
 +
#*'''Name''': Provide a name for this task. 
 +
#*'''Project''': The project will default to the project that you clicked on the projects tab.
 +
#*'''Parent Task''': If you wish to associate this task to a parent, enter the parent task name, or click the magnifying glass to search for the task.
 +
#*'''Description''': (Optional) Enter a description of the task.  While this is optional, it provides a means to add additional information about what needs to be accomplished to complete the task.
 +
#*'''Start Date''': Enter the date on which activity on this task should begin.
 +
#*'''End Date''': Enter the date this task should be completed. The end date will be used to identify tasks that are over-due.
 +
#*'''Assigned To''': Select the staff member who is responsible for completing this task.
 +
#*'''Type''': (Optional) Select the type of task from the drop-down list. Types are used for reporting and filtering. Color-coding tasks make it easy to see the different types of tasks on the calendar. To add additional types, click the '''edit''' hyper-link.
 +
#:[[File:Task Types2 CP.jpg|center]]
 +
#*'''Priority''': Select the priority you wish to associate to this event.
 +
#Click '''Done'''.
 +
 
 +
==Create a Project Template==
 +
 
 +
Instead of developing a new project each time, you can use a template and simply change the desired information. For Example: If you have a standard approach and tasks for on-boarding your new members, you can create a template. Then, you can select this template each time you setup a new member on-boarding project.
 +
 
 +
#Click '''Project/Task''' in the left-hand navigation panel.
 +
#On the '''Projects/Task''' screen, click the '''Templates''' tab.
 +
#:[[File:PT Template.JPG|center]]
 +
#Click the '''New Template''' button.
 +
#:[[File:Add Edit Template CP.JPG|center]]
 +
#Enter the following information:
 +
#*'''Project Category''': Select a project category. Categorization makes it easy for you to filter and report on your projects. When '''Event''' is selected, this type of template will be displayed for selection on the '''Tasks''' tab of an event. When '''Member''' is selected, this template will be available on the '''Tasks''' tab of a member.
 +
#*'''Name''': Enter a name for this project. Best practice is to provide a name which at a glance lets you know what this template is used for. This is a required field.
 +
#*'''Description''': (Optional) Add further information about this template.
 +
#Add tasks to the template. Add the tasks that are involved in completing this project. When you actually use the template, you will be able to add additional tasks or remove tasks that are not needed.
 +
#*In the '''Task List'''
 +
#:[[File:Add Task to Template CP.jpg|center]]
 +
#::Click the '''Add Task''' hyper-link.
 +
#:[[File:Add Task to Template.JPG|center]]
 +
#Configure the following:
 +
#*'''Children must be completed first.''': If this task is a parent task, select this option if all child tasks must be marked as completed prior to this task being marked as completed.
 +
#*'''Task Name''': Enter a name for this task. Best practice is to provide a name which,at a glance, describes the activity of the task.  This is a required field.
 +
#*'''Description''': (Optional) Provide additional details about this task, such as the activities the task includes.
 +
#*'''Start''': Select the number of <days, weeks or months> before or after the project start date that this task must begin.  When this template is used for a project, and a start date is defined, specific start dates will be associated to the task.
 +
#*'''Start''': Select the number of <days, weeks, months> before or after the project end date that this task must be completed.  When this template is used for a project, and an end date is defined, specific end dates will be associated to the task.
 +
#*'''Assigned To:''': You may select the staff member to whom this task is to be assigned. This is optional when creating a template, and best practice is to assign the staff member when you use the template for a project.
 +
#:'''Type''': (Optional) Select a project Type, or click the '''edit type''' hyper-link to add new types. Types are used for sorting on the tasks screen and on the ''''Task Calendar'''. 
 +
#*'''Priority''': (Optional) Set a task priority of Low, Normal, High, Critical.
 +
#Click '''Done'''.
 +
 
 +
==Updating/Completing Tasks==
 +
 
 +
Your staff can monitor their tasks, update and mark tasks as completed from the Project/Tasks '''Summary''' tab, on a member's '''Tasks''' tab, or on an event's '''Tasks''' tab.
 +
 
 +
===Update Completion Progress===
 +
 
 +
Updating progress on a task allows you to see the percent of work that has been completed, and the percent of work remaining. By reviewing task progress, you have a good understanding of whether the project will be completed on time.
 +
 
 +
#Click the task that requires updating.
 +
#:[[File:View task1.JPG|center]]
 +
#To mark the progress of completion, the percent complete may be entered in the '''% complete''' text box
 +
#:'''OR'''
 +
#:If the task is completed, click the '''Completed''' check-box.
 +
#Click '''Done'''.
 +
 
 +
===Add Comments to a Task===
 +
 
 +
Another way to communicate task progress is by simply adding comments when you update your percent complete. Comments can also be used to provide additional details about the work being done on the task.
 +
 
 +
#Click the task that requires updating.
 +
#:[[File:View task1.JPG|center]]
 +
#Click the '''Comments''' hyper-link.
 +
#:[[File:Comments Tasks.JPG|center]]
 +
#:The comments dialog box will display all comments that have been entered for this task.
 +
#Enter desired comments in the text-box.
 +
#Click '''Add'''.
 +
#Click '''Done'''.
  
===Step 1===
+
===Add Files to a Task===
Click the '''Projects''' tab near the top of the Project/Task Manager screen. (See figure 2).
 
  
[[File:2015-06-05 11-11-54.png|thumb|left|500px|Figure 2: The Projects screen]]
+
#Click the task that requires updating.
 +
#:[[File:View task1.JPG|center]]
 +
#Click the '''Files''' hyper-link.
 +
#:[[File:Add Files to Task.JPG|center]]
 +
#:The '''Files''' page will display a list of all files previously imported for this task.
 +
#Click the '''Choose Files''' button to browse and upload the desired file.
 +
#Click '''Done'''.
  
===Step 2:===
+
==Monitoring Projects/Tasks==
Click the '''New Project''' button near the upper right part of the '''Projects''' screen. (See figure 2).
 
  
===Step 3:=== Give your project a name and an end date. (These are the only two required fields on the '''Add Project''' screen. We will discuss the optional fields in another section). Click the '''Done''' button near the lower right part of the '''Add Project''' screen. (See figure 3).
+
The '''Summary''' tab in the Project/Tasks module provides an overall view of all projects/tasks.
  
 +
[[File:Proj Tasks Summary.JPG|center]]
  
[[File:2015-06-05_11-22-11.png|thumb|left|600px]]
+
===Task Summary By Person===
  
'''Figure 3''' The '''Add Projects''' popup screen
+
The '''Task Summary By Person''' section on the '''Summary Tab''' provides a view of all staff members to whom tasks have been assigned, tasks that are coming due, tasks that are over-due, and tasks recently completed. Having visibility into every team member's task list is also useful for understanding whether people are falling behind and provides you with the opportunity to re-assign tasks to another team member, if needed.
  
 +
[[File:Task Summary by Person.JPG|center]]
  
'''Step 4:''' After clicking '''Done''', the '''Add Project''' popup screen will disappear and you will be back on the '''Projects''' screen with your new project listed at the top. (See figure 4).
+
Clicking a person's name, will display a list of that person's tasks.
  
 +
[[File:Tasks Filtered.JPG|center]]
  
[[File:2015-06-05_11-53-44.png|800px|frameless|border]]
+
===Projects with Open Items===
  
'''Figure 4''' Your first project
+
The '''Projects with Open Items''' section of the '''Summary''' tab will display all projects with items that remain open.
  
 +
[[File:Projects with Open Items.JPG|center]]
  
'''Step 5:''' Now to create a task for your new project. Go to the Tasks page by clicking the '''Tasks''' tab near the top of the screen. (See figure 5).
+
Click on a project name to view all tasks assigned to the project (both open and completed will be displayed).
  
 +
[[File:Open Items.JPG|center]]
  
[[File:2015-06-05_12-17-13.png|800px|frameless|border]]
+
===Overdue Tasks===
  
'''Figure 5''' The Tasks page
+
The '''Overdue Tasks''' section of the '''Summary''' tab will display a list of all overdue tasks.
  
'''Step 6:''' Create a new task by clicking the '''New Task''' button near the upper right corner. (See figure 5).
+
[[File:Over-due Tasks.JPG|center]]
  
'''Step 7:''' This will bring up the '''Task Add/Edit''' popup screen. (See figure 6).
+
Click on a task name to view further details of the task.
  
 +
[[File:View task1.JPG|center]]
  
[[File:Example.jpg]]
+
===Upcoming Tasks===
  
'''Figure 6''' The Task Add/Edit
+
The '''Upcoming Tasks''' section of the '''Summary''' tab, provides a view of tasks and their upcoming due dates.
  
 +
[[File:Upcoming Tasks.JPG|center]]
  
'''Step 8:''' Give your first task a name and an end date. (These are the only two required fields on the '''Task Add/Edit''' screen. We will discuss the optional fields in another section).
+
Clicking on the project name will open the full project, clicking on the task will display the details of the task, and clicking on the staff member's name will open the tasks tab filtered to that staff member. Over-due tasks will be identified by a red yield sign [[File:Red Yield Sign CP.JPG]].
  
'''Step 9:''' In order to link this task to the project we just created, select that project from the '''Project''' dropdown list. (See figure 6).
+
==Working with the Project/Task Calendar==
  
'''Step 10:''' To save this task, click the '''Done''' button near the lower right part of the '''Task Add/Edit''' popup screen.
+
An alternate view of all of your tasks is available on the '''Task Calendar''' tab. The calendar can be filtered to display the tasks for all projects or an individual project; all staff members or an individual staff member; all categories or an individual category; and all task types or an individual task type.  Color-coding of tasks makes it easy for you to identify the types of tasks.  
  
==What’s Next?==
+
[[File:Task Calendar CP.JPG|center]]
  
Now that you have created your first project, let’s explore some of the more advanced features of Project/Task Manager. The next section will introduce you to assigning owners, creating types, using the Summary screen and how to get the most out of these features.
+
You can click into any of the tasks to view details, and update the task.

Latest revision as of 16:03, 8 August 2018

Overview

Project/Task Manager can help you manage and track projects by allowing you to assign tasks to staff members, monitor the project’s progress and keep an eye on deadlines. NOTE: Currently, this tool is in the beta stage and is available on the Pro version of ChamberMaster and MemberZone.

PT Links CP.JPG

Using Project/Task Manager will give you the ability to:

  • Assign projects and tasks to your staff members
  • Track their progress with a “percentage complete” value
  • Set deadlines for projects and tasks
  • Keep an eye on the “big picture” with the Summary and Task Calendar pages
  • Create templates for recurring projects like bringing on a new member

Create a New Project

  1. Click Projects/Task in the left-hand navigation panel.
  2. Click the Projects tab.
    New Project CP.JPG
  3. Click the New Project button.
    Add Project CP.JPG
  4. Enter the following:
    • Category: (Optional) Select a category project. Assigning categories make it easy to filter and report on project.
    • Template: (Optional) If you have previously designed a template that can be used for this project, select it from the drop-down list.
    • Name: Provide a name for the project. For Example: If you are creating a project for an event, you may wish to name it the same as the event. This field is required.
    • Start Date: Enter the project start date.
    • End Date: Enter the project end date. This field is required.
    Project Owner: Select a project owner from the drop-down list. All of your active staff members will be available for selection.
  5. Click Done.

The Projects tab will display the new project in the list of projects.

Add Tasks to a Project

Once a project has been created, you can add the tasks necessary to complete the project. A task can be big or small, easy or hard — but it's never more than a job that needs to get done to successfully complete your project.

  1. On the Projects tab, click the hyper-link for the project to which you wish to add tasks.
    Add Tasks CP.JPG
  2. On the Tasks screen, click the New Task button. Note: You may create tasks on the Tasks tab as well. See Create Tasks for further information.
    Task Add Edit CP.JPG
  3. Enter the following information:
    • Name: Provide a name for this task.
    • Project: The project will default to the project that you clicked on the projects tab.
    • Parent Task: If you wish to associate this task to a parent, enter the parent task name, or click the magnifying glass to search for the task.
    • Description: (Optional) Enter a description of the task. While this is optional, it provides a means to add additional information about what needs to be accomplished to complete the task.
    • Start Date: Enter the date on which activity on this task should begin.
    • End Date: Enter the date this task should be completed. The end date will be used to identify tasks that are over-due.
    • Assigned To: Select the staff member who is responsible for completing this task.
    • Type: (Optional) Select the type of task from the drop-down list. Types are used for reporting and filtering. Color-coding tasks make it easy to see the different types of tasks on the calendar. To add additional types, click the edit hyper-link.
    Task Types2 CP.jpg
    • Priority: Select the priority you wish to associate to this event.
  4. Click Done.

Create a Project Template

Instead of developing a new project each time, you can use a template and simply change the desired information. For Example: If you have a standard approach and tasks for on-boarding your new members, you can create a template. Then, you can select this template each time you setup a new member on-boarding project.

  1. Click Project/Task in the left-hand navigation panel.
  2. On the Projects/Task screen, click the Templates tab.
    PT Template.JPG
  3. Click the New Template button.
    Add Edit Template CP.JPG
  4. Enter the following information:
    • Project Category: Select a project category. Categorization makes it easy for you to filter and report on your projects. When Event is selected, this type of template will be displayed for selection on the Tasks tab of an event. When Member is selected, this template will be available on the Tasks tab of a member.
    • Name: Enter a name for this project. Best practice is to provide a name which at a glance lets you know what this template is used for. This is a required field.
    • Description: (Optional) Add further information about this template.
  5. Add tasks to the template. Add the tasks that are involved in completing this project. When you actually use the template, you will be able to add additional tasks or remove tasks that are not needed.
    • In the Task List
    Add Task to Template CP.jpg
    Click the Add Task hyper-link.
    Add Task to Template.JPG
  6. Configure the following:
    • Children must be completed first.: If this task is a parent task, select this option if all child tasks must be marked as completed prior to this task being marked as completed.
    • Task Name: Enter a name for this task. Best practice is to provide a name which,at a glance, describes the activity of the task. This is a required field.
    • Description: (Optional) Provide additional details about this task, such as the activities the task includes.
    • Start: Select the number of <days, weeks or months> before or after the project start date that this task must begin. When this template is used for a project, and a start date is defined, specific start dates will be associated to the task.
    • Start: Select the number of <days, weeks, months> before or after the project end date that this task must be completed. When this template is used for a project, and an end date is defined, specific end dates will be associated to the task.
    • Assigned To:: You may select the staff member to whom this task is to be assigned. This is optional when creating a template, and best practice is to assign the staff member when you use the template for a project.
    Type: (Optional) Select a project Type, or click the edit type hyper-link to add new types. Types are used for sorting on the tasks screen and on the 'Task Calendar.
    • Priority: (Optional) Set a task priority of Low, Normal, High, Critical.
  7. Click Done.

Updating/Completing Tasks

Your staff can monitor their tasks, update and mark tasks as completed from the Project/Tasks Summary tab, on a member's Tasks tab, or on an event's Tasks tab.

Update Completion Progress

Updating progress on a task allows you to see the percent of work that has been completed, and the percent of work remaining. By reviewing task progress, you have a good understanding of whether the project will be completed on time.

  1. Click the task that requires updating.
    View task1.JPG
  2. To mark the progress of completion, the percent complete may be entered in the % complete text box
    OR
    If the task is completed, click the Completed check-box.
  3. Click Done.

Add Comments to a Task

Another way to communicate task progress is by simply adding comments when you update your percent complete. Comments can also be used to provide additional details about the work being done on the task.

  1. Click the task that requires updating.
    View task1.JPG
  2. Click the Comments hyper-link.
    Comments Tasks.JPG
    The comments dialog box will display all comments that have been entered for this task.
  3. Enter desired comments in the text-box.
  4. Click Add.
  5. Click Done.

Add Files to a Task

  1. Click the task that requires updating.
    View task1.JPG
  2. Click the Files hyper-link.
    Add Files to Task.JPG
    The Files page will display a list of all files previously imported for this task.
  3. Click the Choose Files button to browse and upload the desired file.
  4. Click Done.

Monitoring Projects/Tasks

The Summary tab in the Project/Tasks module provides an overall view of all projects/tasks.

Proj Tasks Summary.JPG

Task Summary By Person

The Task Summary By Person section on the Summary Tab provides a view of all staff members to whom tasks have been assigned, tasks that are coming due, tasks that are over-due, and tasks recently completed. Having visibility into every team member's task list is also useful for understanding whether people are falling behind and provides you with the opportunity to re-assign tasks to another team member, if needed.

Task Summary by Person.JPG

Clicking a person's name, will display a list of that person's tasks.

Tasks Filtered.JPG

Projects with Open Items

The Projects with Open Items section of the Summary tab will display all projects with items that remain open.

Projects with Open Items.JPG

Click on a project name to view all tasks assigned to the project (both open and completed will be displayed).

Open Items.JPG

Overdue Tasks

The Overdue Tasks section of the Summary tab will display a list of all overdue tasks.

Over-due Tasks.JPG

Click on a task name to view further details of the task.

View task1.JPG

Upcoming Tasks

The Upcoming Tasks section of the Summary tab, provides a view of tasks and their upcoming due dates.

Upcoming Tasks.JPG

Clicking on the project name will open the full project, clicking on the task will display the details of the task, and clicking on the staff member's name will open the tasks tab filtered to that staff member. Over-due tasks will be identified by a red yield sign Red Yield Sign CP.JPG.

Working with the Project/Task Calendar

An alternate view of all of your tasks is available on the Task Calendar tab. The calendar can be filtered to display the tasks for all projects or an individual project; all staff members or an individual staff member; all categories or an individual category; and all task types or an individual task type. Color-coding of tasks makes it easy for you to identify the types of tasks.

Task Calendar CP.JPG

You can click into any of the tasks to view details, and update the task.